top of page
FLOOR PLANS AND PICTURES
LIVING IN LOUISVILLE

 

 

 

 

 

 

The Chevrolet Corvette has been manufactured in Bowling Green, KY, just 90 minutes South of Louisville since 1981.  The Corvette Museum hosts daily tours, featuring displays of mint classics, prototypes, racing champs and more.

SPACE AVAILABLE


Space is now available for as low as:

$5 per sqft, Net Lease

Call today to discuss your specific needs and schedule a time to meet and view the spaces that will accommodate
your business.

(502) 689-0130 or (502) 416-8384

THIRD FLOOR

THIRD FLOOR

The third floor features a total of 9,500sqft of secured, single entry, windowless office space consisting of 7 individual offices, three large open floor plan rooms totaling 4,400sqft, a 200sqft work/reception area common to 5 offices, mens and women's restrooms, a water fountain, and a utility room.

 

This floor is directly accessible from the parking garage, with single door entry to the entire secure office space.

 

In addition to the main elevator bank and freight elevator, this floor is accessible by a private elevator that services only the first four floors and basement.

 

THIRD FLOOR STATISTICS

  • 9,500sqft

  • Direct Access from Garage

  • Private Elevator

  • Secure, Windowless Floor

  • Single Door Entry

  • 7 Individual Offices

  • 4,400sqft in Three Open Rooms

  • 200sqft Common Area

  • Water Fountain

  • Men's and Women's Restrooms

        

THIRD FLOOR PICTURES

 
Office

Office

One of 7 Individual Offices

Open Floor Area

Open Floor Area

One of three large open floor plan rooms totaling 4,400sqft

Open Floor Area

Open Floor Area

One of three large open floor plan rooms totaling 4,400sqft

Open Floor Area

Open Floor Area

One of three large open floor plan rooms totaling 4,400sqft (reverse angle)

Open Floor Area

Open Floor Area

One of three large open floor plan rooms totaling 4,400sqft

Hallway

Hallway

Women's Restroom

Women's Restroom

Main Elevator Bank

Main Elevator Bank

Accessible directly from parking garage, and accessing single entry door to secure floor

Entrance

Entrance

Access from parking garage

THIRD FLOOR - FLOOR PLAN (Click for larger view.)

 

 

NOTE: Floor plans are scheduled to be available online by March 17, 2014.

 
bottom of page